- Joined
- 2 August 2006
- Posts
- 105
- Reactions
- 0
One advantage of having the Newcastle Port Handling facility is that they hopefully gave their own ore priority during the bottleneck!
All those ships waiting off Newcastle are for the coal loader berths.
CBH product is loaded at a different terminal completely within the port- no bottlenecks there.