This is a mobile optimized page that loads fast, if you want to load the real page, click this text.

ADI - Adelphi Energy

I read that Kunde 3 well was being fracced over the last weekend.... when are where are we going to learn the results of this frac job?
 



Hi folks,

ADI ... wide bid/offer spread, as market anticipates news,
expected 20122007, as posted above ...

have a great day

paul



=====
 
paul,

your doing it again, somehow theres a good chance your predictions are going to be astrnomically close..
 
How do you do it???

I guess we will wait and see what happens on Kunde 3 tonight but alas I will not be holding my breath....although you have just given us the date....
 
20122007 our time? or Texas time I wonder.
I will say that the sellers side looks thin at the close today, and plenty of buyers through the depth.
 
i give up on dates, theres every chance at any moment something can go wrong.. as i have said before, expect delays, plan for them then add some more for good measure..

that kunde 3 well was started in march 07!! can anyone remember when kennedy started?? sept 26..

on 7th November BUR started Jet 3... and its about to go on production..

i am not complaining at all, as i fully undersatnd why this is happening.. but these wells are very unique in every respect, there isnt one thing going on in these wells that you would do in traditional chalks!
 
I have been planning for delays on this project since sept 2006. How much planning can you do before you say enough?
 
jacko, i think for you guys the waiting is practically over
for me its going to be very interesting as to how things pan out in the next few days and weeks
 
just thought i would put up a little something for the uk guys..

i aint saying anything other than if you look at kunde 2 you will notice something about the bottom hole coordinates on both those kunde 2 permits..

interesting workings on those kunde wells imho..

hope things pan out as pauls summer solstice prediction says..

 

Attachments

  • F4C1AA14422D7855004E9B2DADC58170.png
    11.8 KB · Views: 255
20122007 our time? or Texas time I wonder.
I will say that the sellers side looks thin at the close today, and plenty of buyers through the depth.
Must be Texas time ADI down 4c or 9% today. No announcements to cause it. Looks like we wait until tomorrow. Groundhog day !!!!!!!!!
 
the buyers are real clever right now.. without news the sellers are at their mercy..

its great to see.. really good to see the buyers make each one of them pay big time..
 
Smart buyers for sure getting there share at almost the same price I paid 18 months ago or maybe I wasnt such a smart buyer.
Well hopefully they wont have too wait as long as some of the hardy shareholders for positive definative news.
Look forward too the new year and increased news flow
 
Interesting point from HC:

4.5 inch casing
Forum: ASX - By Stock (Go Back)
Code: ADI - ADELPHI ENERGY LIMITED (Google ADI)
21/12/07 11:57 (View) Back Post Reply Options:
resourceboom
Post #: 2403747
Start of thread:
IP: 119.11.xxx.xxx
Sentiment: Buy
Disclosure: Stock Held
Views: 22


anyone take any interest in the casing at Kennedy 1H using 4.5 inch pipe. seems quite large according to the azz folks,

eg from AZZ thread:

"The announcement they have run 4.5" casing at JHF indicates expectation of a large volume of gas, otherwise 2.3/8" casing would save a bundle is my advice"
 
4.5 inch?? sound like a perfect size liner for the type of wells these guys have built..
 
Well AgentM must be on holiday I'm affraid I cannot give you the great commentry he does but then again none of us ADIans can!
A poor close for us holders but a great buying opportunity for those who think we are on a winner.
The drip feed scenario is killing the patience of some if not most holders.
2008 I hope should start well with the imminent fracing of K1 hopefully Kunde has been fraced with flow results due out any time soon those should give the sp a real boost but in all feel it maybe 6 months before we really know what we got
 
Kennedy #1H Well
A 4-1/2 inch liner was cemented in the horizontal section of the Kennedy well and the drilling rig was released on 8 December 2007. The operator intends to run a radial bond log to assess the cement job before finalising plans for an extensive fracture stimulation program and test operations on the well. It is likely that these operations will start early in the new year.​

and still nothing happens!!​

so whats the go there? why not get it happening?​
 
View from q44 on ADVFN that they will wait to frac all wells before assessing and announcing:-

quattro44 - 30 Dec'07 - 11:03 - 8575 of 8575

"They would only stop for an hour or 2 on Cristmas Day on a drilling rig if practical. If a frac job would naturally fall on Christmas Day then they might wait a day.
I reckon they will wait to frac all wells before assessing and announcing.
q44."
 
Well lets hope we dont have too wait too much longer we have waited long enough and seen our investments drop.
1 year ago ADI was trading a $1 now its not even half that.definately time to repay the faithfull
 
All the research in the world doesn't change the fact that this is on shore Texas and as such, very very tricky. The market is not stupid and the facts are the Operator hasn't been able to get commercial flow yet. They may not ever get commercial flow. I see further delays and this could still not be concluded in 2008. Agentm seems to have lived his life for ADI but that in itself will not get the wells to flow. Never fall in love with a stock! ADI has taught plenty a harsh lesson.
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more...