- Joined
- 2 October 2006
- Posts
- 3,043
- Reactions
- 2
ASX Release
7 April 2011
TWO NEW LEIGHTON OLMOS WELLS COMBINED FLOW 550 BOEPD
Texon advises that two of its recently drilled 3 Olmos wells on its Leighton Project, (Peeler #2 and Tyler Ranch #8) have begun to flow oil and gas at the gross combined rate of 550 boepd from the Olmos reservoir (comprising 435 bopd and 689 mcf of gas per day).
The Company has an average 65% Working Interest (48.75% net revenue interest) in the wells.
The wells will be connected to oil tanks and the gas pipeline in the next 2 weeks.
The third recently drilled Olmos well (Tyler Ranch #7) has been fracced and is in the process of being tested.
The Company’s drilling success rate remains at 100% in the Leighton Olmos reservoir, including the 2 wells referred to above. There are now 9 Olmos producing wells in the field as well as 25 undrilled Olmos production well locations.
WOW
that olmos formation keeps on paying back nicely!!
We should see RBS update on the back of this, although they may wait for the other result as well. Hopefully should be another good result and upgrade.
Condog,
Have to remember that the values you're quoting are gross , wheras the values in the graphs are net to TXN.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?