springhill
Make the drill work for YOU
- Joined
- 20 June 2007
- Posts
- 2,555
- Reactions
- 11
Re: NUP - NuPower Uranium
Arganara Phase 3 Extension Drill Results
http://www.asx.com.au/asxpdf/20120703/pdf/4276n903cwc3ql.pdf
NuPower is pleased to announce that initial assay results from Phase 3 extension drilling at Arganara Prospect has increased the phosphate footprint by 65% from 17.8km² to 29.4km². This increase will add valuable phosphate tonnes to the imminent maiden JORC resource.
Nupower has received lab analysis for 102 holes of its 249 hole Phase 3 program. These results are predominantly from the extension component of the program designed to increase the Arganara phosphate footprint with hole spacing’s necessary to enable inclusion in the resource calculation.
Highlights from the first batch of drill assay results include:
ARC475: 3m @ 26.9% P2O5 from 13m including 1m @ 30.2 P2O5
ARC481: 7m @ 24.2% P2O5 from 28m including 1m @ 30.1 P2O5
ARC477: 6m @ 22.9% P2O5 from 19m including 2m @ 29.9 P2O5
ARC421: 8m @ 21.8% P2O5 from 21m including 2m @ 26.7 P2O5
Arganara Phase 3 Extension Drill Results
http://www.asx.com.au/asxpdf/20120703/pdf/4276n903cwc3ql.pdf
NuPower is pleased to announce that initial assay results from Phase 3 extension drilling at Arganara Prospect has increased the phosphate footprint by 65% from 17.8km² to 29.4km². This increase will add valuable phosphate tonnes to the imminent maiden JORC resource.
Nupower has received lab analysis for 102 holes of its 249 hole Phase 3 program. These results are predominantly from the extension component of the program designed to increase the Arganara phosphate footprint with hole spacing’s necessary to enable inclusion in the resource calculation.
Highlights from the first batch of drill assay results include:
ARC475: 3m @ 26.9% P2O5 from 13m including 1m @ 30.2 P2O5
ARC481: 7m @ 24.2% P2O5 from 28m including 1m @ 30.1 P2O5
ARC477: 6m @ 22.9% P2O5 from 19m including 2m @ 29.9 P2O5
ARC421: 8m @ 21.8% P2O5 from 21m including 2m @ 26.7 P2O5