Hey Bigdog you missed an ann lol.
From the ann...
"A production plant is planned for the Golden Eagle gas field. The company is confident of moving to production on the basis of the capacity of the existing wells. The plant will process gas from Paradox Basin #1 and #3 which will be delivered into the Williams gas pipeline. Our US landman is currently working on converting the existing water right of way to a gas right of way to tie into the Williams line. Simultaneously investigations are underway into development options including utilising a gas gatherer to independently supply, build and operate a production facility or potentially owning and operating our own facility. The first firm development proposal from an independent gas gatherer is expected in August. At this stage the longest lead time item appears to be the establishment of a tap point and installation of metering into the Williams pipeline. Williams gas pipelines have initially responded that the tap could be established early in 2011."
A couple of things..it seems that the pilot plant has been rejected in favour of permanant production plant ...this err is good err!!
The other point is that it will be "early in 2011" before they can actually tap into the grid. 5 months to run a 2.8K pipeline??I cant believe that. 18 metres/day!!!My old mum could dig that in a couple of weeks.
Or...can the "gas gatherer" truck the gas out till such time as the tap is made??
From the ann...
"A production plant is planned for the Golden Eagle gas field. The company is confident of moving to production on the basis of the capacity of the existing wells. The plant will process gas from Paradox Basin #1 and #3 which will be delivered into the Williams gas pipeline. Our US landman is currently working on converting the existing water right of way to a gas right of way to tie into the Williams line. Simultaneously investigations are underway into development options including utilising a gas gatherer to independently supply, build and operate a production facility or potentially owning and operating our own facility. The first firm development proposal from an independent gas gatherer is expected in August. At this stage the longest lead time item appears to be the establishment of a tap point and installation of metering into the Williams pipeline. Williams gas pipelines have initially responded that the tap could be established early in 2011."
A couple of things..it seems that the pilot plant has been rejected in favour of permanant production plant ...this err is good err!!
The other point is that it will be "early in 2011" before they can actually tap into the grid. 5 months to run a 2.8K pipeline??I cant believe that. 18 metres/day!!!My old mum could dig that in a couple of weeks.
Or...can the "gas gatherer" truck the gas out till such time as the tap is made??