- Joined
- 2 May 2007
- Posts
- 4,691
- Reactions
- 2,903
@BlindSquirrel - I am wondering, if you meant to publish the video on BRU thread and instead published on CVN to be safe
@BlindSquirrel - I am wondering, if you meant to publish the video on BRU thread and instead published on CVN to be safe
Hmm. Reading your posting of Monday and gather it was not for BRU for sure. But on Monday how could you sniff? May oil companies forget about all those scanners and hire you instead. LOLsneaky little 23% increase today after announcement:
But on Monday how could you sniff? May oil companies forget about all those scanners and hire you instead. LOL
Nonetheless, good work mate
Happy days are returning for CVN and STO holders hopefully now on wardsI've been following them closely. The quote that really gets me hot and bothered was from Fred Wehr from Quadrant at the time "the low case is solidly commercial, the mid-case is awesome and the upside is staggering."
I'm not trying to time it, but the drill bit has been doing its thing for a month or two now so there will be more announcements to come - I trust that they will say the right things.
Good start 11%. Hope it sustains.Happy days are returning for CVN and STO holders hopefully now on wards
https://www.asx.com.au/asxpdf/20190606/pdf/445ndkpn8yfbpd.pdf
https://www.asx.com.au/asxpdf/20190606/pdf/445nd80w9wy5nz.pdf
MateI've been following them closely. The quote that really gets me hot and bothered was from Fred Wehr from Quadrant at the time "the low case is solidly commercial, the mid-case is awesome and the upside is staggering."
I'm not trying to time it, but the drill bit has been doing its thing for a month or two now so there will be more announcements to come - I trust that they will say the right things.
@Trav.@Miner this is a bit unexpected hence leaving me a little concerned as they gave an update on the 2/7 for the drilling of Roc South-1 with the following as a plan and I am surprised that they have achieved this in such a short time.
Forward Plan
Set and cement the 13-3/8” casing and drill ahead in 8-1/2” hole to planned section depth of approximately 4,500 metres MD. The Caley and Baxter Members are anticipated to be encountered in the 8-1/2” hole section. Wireline logs will be run over the Caley and Baxter Members before setting a 7” liner and drilling ahead to the deeper objectives.
@Miner I am surprised that they have achieved this in such a short time.
Hello and welcome to Aussie Stock Forums!
To gain full access you must register. Registration is free and takes only a few seconds to complete.
Already a member? Log in here.