Very interesting audio
http://remotecontrol.jetstreammedia.com/15167
DYOR ........... (I hold a very large parcel)
http://remotecontrol.jetstreammedia.com/15167
DYOR ........... (I hold a very large parcel)
Also good news should be that as this well is out of the other area...taxes will not be huge...bonus!
Hate to break it to you but this well is in the "central NSE fault compartment". So no tax relief here unfortunately.
Ahh schweppes...sorry i didnt read it properly peeps...all this partying in foreign lands...thanks for the correction!
Why hasnt it been released to mkt yet?
Anyone taken into account the extremely unstable and worsening social problems in Thailand? It seems to me that there are too many eggs in one basket here.
there is a bit of discounting for sovereign risk, but the thais are smart... unlike some asian countries they seem to have a good awareness of how important foreign investment, tourism etc is to their country... i cant see them taking back any permits or anything like that... even if there is some civil unrest, i cant see it affecting CVN too much... thailands military are pretty strong too, should be able to keep things under control...
however it does raise a good point about diversification... with all this extra cash rolling in and very depressed asset values, perhaps it is time to look at buying into another project/company in a different geographic region?
otherwise what do you do with the cash? dividend time? capital return? throw a an all expenses paid full moon party for all shareholders?
Yes, high soverign risk discounting projects, and markets crashing...
This stock should be over $1 right now (based on expected, and current revenues)... 15,000 BOPD is very big....
heres an article that is a few weeks old...
I very much so like CVN...
Technically CVN looks set for a big fall through present support.
A descending triangle and a failure of buyers at recent lows does not auger well.
gg
Hi folks,
CVN ... expecting one positive time cycle, in the week ahead ...
Updated CVN chart attached, below.
have a great day
paul
=====
Hi folks,
CVN ... expecting one positive time cycle, in the week ahead ...
Updated CVN chart attached, below.
have a great day
paul
=====
CALGARY, ALBERTA--(Marketwire - Oct. 28, 2008) - Pan Orient Energy Corp. (TSX VENTUREOE) -
NOT FOR DISSEMINATION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.
NSE-D1 appraisal well (60-per-cent working interest and operator)
The NSE-D1 appraisal well, located approximately 455 meters north of the NSE-B drill pad is currently on a production at a rate of approximately 710 bopd with a 0.1 to 0.3% water cut. The well is producing within the limits of the current pump configuration with a fluid level at approximately 205 meters below ground level suggesting the well can be produced at a higher rate. A larger capacity tubing pump will be installed once it has cleared Thai customs later this week.
NSE-A4 appraisal well (60-per-cent working interest and operator)
The NSE-A4 appraisal well had originally reached a total depth of 787 meters TVD after penetrating the top of the target volcanic reservoir at 730 meters TVD. Severe mud losses were experienced while drilling, indicating the most extensively fractured reservoir section encountered in any well to date. While setting the 4.5" liner, an obstruction was encountered in the hole, just out of the casing window, making it impossible to complete the well. As a result, the 7" casing was milled out and set deeper prior to kicking off into the main volcanic target zone. This operation has now been completed. While drilling the main volcanic target severe mud losses were encountered once again, in addition to live oil to surface while reaming below the 7" casing shoe. At the present time the hole is being conditioned to set a 4.5" liner and equip the well for production.
Testing is anticipated to be completed within 10 days of setting the 4.5" liner, at which time test results will be announced. Upon completion of the current operation, the rig will be moved to the NSE-C1 well location which is 1,000 meters east of the NSE-B drill pad and targeting an area of possible reserves as defined in the year end 2007 NI 51-101 compliant reserves report.
NSE-D2 appraisal well (60-per-cent working interest and operator)
The NSE-D2 appraisal well is currently drilling ahead at depth of 810 meters measured depth (726 meters true vertical depth) near casing point, just above the estimated depth of the main volcanic objective that is expected to be encountered structurally much higher than at NSE-D1. The subsurface target is located approximately 330 meters north of the NSE-D1 location. Drilling is anticipated to be completed in the next 6 days.
Hello and welcome to Aussie Stock Forums!
To gain full access you must register. Registration is free and takes only a few seconds to complete.
Already a member? Log in here.