more results are expected shortly...
10.0 metres at 556 ppm U3O8 including 2.0 metres at 1,204 ppm U3O8.
9.0 metres at 518 ppm U3O8 including 1.2 metres at 1,848 ppm U3O8 (4 lb/t).
...
extensive rc drilling will follow at thunderbox...
The diamond drill rig has been relocated 500 metres to the north east to follow up RC drilling that returned intersections of up to 3 metres at 2,964 ppm U3O8, [including 1 metre at 8,071 ppm]
...
this includes one hole...
All six holes intersected visible uranium mineralisation
...
whilst the assay results for this hole are not yet back from the lab, the...
approximately 20 metres to the north and down-dip from a three metre intercept in 2008 RC hole 08PCRC020 which assayed 2,964 ppm U3O8 including one metre at 8,071 ppm U3O8
...
the results from the remaining four holes are not expected for several weeks, with down-hole gamma logging beginning mid-june...
mineralisation in TPCDD006 appears to be at least as intense as the high grade intercept in 08PCRC020
...
results also incl 9m @ 906 ppm U308Results have been received for 12 RC holes drilled at the Thunderball Uranium Prospect in July, including a one metre interval in hole TPCRC008 assaying 3.1% U3O8 (68 lbs/t).
The complete mineralised intercept in TPCRC008 was 5 metres at 7,600 ppm U3O8 (17 lbs/t) from 120 metres down hole.
In addition to containing the highest grade intercept from Thunderball to date, the latest results delivered the widest intercept in hole TPCRC010 – 11 metres at 1,200 ppm U3O8 [incls 2m @ 2,962 ppm].
...
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?