- Joined
- 25 July 2006
- Posts
- 987
- Reactions
- 0
Rederob,
I quite like quotes 40/41 on this thread. Wether youve simply held MRE as an investment.............or traded it on the pulbacks, its a cash cow!.
Bring on the first halfs dividend after 4 months of record Nickle prices.
Excuse me for my excitment but its past 8 bucks today..
Carzy stuff MRE, and nice divi!
Earnings and Dividends Forecast (cents per share)
2006 2007 2008 2009
EPS 72.5 74.3 69.6 53.8
DPS 57.5 45.0 40.0 24.6
thx
MS
With nickel habitually around $50k and showing no real weakness, Comsec's forecast is already dead in the water..... MRE will come close to achieving Comsec's annual earnings forecast within the first half of 2007, and won't need the rest of the year to make up the difference.
KenMRE.
good value again?
how sustainable is this dividend?
IS THIS ANOTHER ZFX on a different time line?
MinerDear Paul
Would you please put more details behind your brief analysis on MInara.
They will have a major shutdown which means no nickel for three months from the plant.
How your historical analysis will adjust with this phenomenon?
Regards
And this addition should satisfy the stupid 100 character rule that Joe insists on, regardless of content.CEO Peter Johnston
The objectives of the shutdown are three-fold. Firstly, it is to complete our normal
statutory requirements such as the inspection of pressure vessels and the
replacement of catalyst in the acid plant. The second is to repair and replace
items, particularly in the acid plant and the H2S plant, and thirdly, to increase
capacity in the acid plant.
Most importantly, in the acid plant the operation of the superheater has been our
most serious ongoing maintenance issue. The superheater is the last of the major
design legacy issues and has caused a large amount of downtime, particularly over
the last two and a half years. Acid availability has been the major cause for plant
down time over this period. During the shut we will replace it at an approximate
capital cost of $15 million. When the replacement superheater is operational, the
plant will be unconstrained for acid production for the first time.
The shut down commences in October and will finish in mid-November. There
are several parts to the shut. The first part commences on 1 October and covers
the H2S plant and the replacement of the H2S reactors. To mitigate the downtime
caused by the H2S reactor replacement, we have developed a backup system using
2
sodium hydrosulphide and that will enable us to continue running the rest of the
plant while the H2S plant work is completed.
The shut of the entire plant commences on approximately 21 October and will
finish on approximately 18 November. We have adopted a different operating
philosophy during this shut by focussing the major work predominantly in the
utilities area, thereby enabling large sections of the plant to continue normal
operations for substantial periods during the shut.
Once the plant is up and running after the shut, we expect it to operate at around
3,000 tonnes of nickel metal per month for the following six months. That will
enable the plant to achieve a stable production profile from which we can build on.
Miner
It's not 3 months:
And this addition should satisfy the stupid 100 character rule that Joe insists on, regardless of content.
Miner
It's not 3 months:
And this addition should satisfy the stupid 100 character rule that Joe insists on, regardless of content.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?