Australia's first tight gas drilling operation is looking very promising in WA. With TSV a 1/4 way through flow testing schedule for Warro3, initially flowing gas at 2.1mmcf, steadily increasing, and also has flowed to the surface without nitrogen lift, is making the proposed tight gas operations for LKO on the Wombat wells more attractive. Once recovery of frac fluids ceases which inhibits the gas flow the rate will be significantly higher. Latent Petroleum will have the stabilised flow rate results just in time for the Tight Gas Alternative conference in June. Where Rob Annells plans to discuss the Operational Case Study for Wombat tight gas field, should give some more interest into LKO too.
The tight gas era arrives
The tight gas era arrives