There has been one piece of good news out recently, that was the results of the Moyes report (reported via a company update recently in January 2012). It backed up the earlier much higher reserves in Soro 201 well and will need 4 more wells for get it all out eventually.
Moyes report has assessed Soro reserves NOW at 56Billion up from initial report assessment of 13 Billion, which is HUGE. Some now used and sold on, but 51 Billion still there and needing the extra 4 wells to get it.
Soro-202 is very soon to be spud and this will double the output with these two wells draining together.
Old gas plant can cope with this amount, but will be needed when 3rd well is drilled and producing.
So all in all good news. Also they are getting 2D AND 3D seismic done over Soro and also Chets which will give more accuracy in where to drill wells.
Patience needed on this one and many not understanding full value and also not willing to wait the long stretches it takes to drill wells etc.
I'm keeping all mine for sure and understand the long stretches will continue UNTIL they really begin growing and production increases revenue and have new gas plant etc
and they are hopefully, able to get more modern equipment which will take less time and reduce chances of breakdowns with equipment etc.
Moyes report has assessed Soro reserves NOW at 56Billion up from initial report assessment of 13 Billion, which is HUGE. Some now used and sold on, but 51 Billion still there and needing the extra 4 wells to get it.
Soro-202 is very soon to be spud and this will double the output with these two wells draining together.
Old gas plant can cope with this amount, but will be needed when 3rd well is drilled and producing.
So all in all good news. Also they are getting 2D AND 3D seismic done over Soro and also Chets which will give more accuracy in where to drill wells.
Patience needed on this one and many not understanding full value and also not willing to wait the long stretches it takes to drill wells etc.
I'm keeping all mine for sure and understand the long stretches will continue UNTIL they really begin growing and production increases revenue and have new gas plant etc
and they are hopefully, able to get more modern equipment which will take less time and reduce chances of breakdowns with equipment etc.