11-04-2007 11:32 AM GDN Drilling Status Report
SP now up a few cents on ANN and currently GDN $1.11 +$0.03 +2.78 pct
Currently drilling out approx. 150’ of cement fill at the well bottom. On completion of a bond log the well will drill on at 6⅛” into the major objective Leadville Limestone.
http://www.asx.com.au/asxpdf/20070411/pdf/311w6c5l73w57d.pdf
Drilling Status Report – 11 April 2007
• Paradox Basin #1 oil & gas well, Grand County, Utah, is at 15,397 feet
(4,692 m) in the Pennsylvanian Molas Formation, at the top of the
well’s primary objective.
• Cementing of casing from the surface to the casing hanger at 9185’ has
been completed. A BOP test has been completed successfully, and following running of a bond log the well will drill on into the Leadville Limestone.
PARADOX BASIN #1 OIL & GAS WELL, UTAH USA
Golden State Resources is pleased to announce that operations casing at the Paradox Basin #1 oil & gas well are proceeding successfully.
Cementing of the new 7” casing from the surface to the casing hanger at 9,185 feet has been completed successfully. The remainder of the well has already been cased at 7” from the casing hanger to bottom at 15,397’.
The rig has completed drill-out of cement, float collar and shoe at the base of the new casing and is currently drilling out approx. 150’ of cement fill at the well bottom. On completion of a bond log the well will drill on at 6⅛” into the major objective Leadville Limestone.
Paradox Basin #1 is at 15,397 feet (4,692 m), in the Pennsylvanian Molas Formation, a distinctive terra rossa palaeosol horizon formed on the top of the Leadville Limestone, the primary
objective of the well.
Would you have any idea how long it will be till they start drilling? In a best and worst case scenario?
Thanks