Lucky_Country
Formerly known as ijh
- Joined
- 30 June 2006
- Posts
- 738
- Reactions
- 0
Flow testing seems too be taking forever.
NT must be close too confiming what exactly they have got with NT2 well must surely be targetting the lower formation that they had too stop drilling.
SL well how long is a piece of string but will be worth the wait I hope
NT must be close too confiming what exactly they have got with NT2 well must surely be targetting the lower formation that they had too stop drilling.
SL well how long is a piece of string but will be worth the wait I hope