I dont think theres any doubt they can get two off the one pad, but i wouldnt at all be surprised to see 3 or 4 attempted. Makes for easy and cheaper scaling if they can.
In an ideal world six wells from one pad would probably be the most efficient, something like this.
Drilling shouldn't be an issue with the steerable gear and they are already cutting the curve at the start of the lateral anyway. I wouldn't be surprised to see savings if 15% or so off the well costs if it can be made to work, but as you say securing acreage is the priority at the moment. At least Turnbull 5 and 6 will give the reservoir engineers something to run the numbers on.