Won't be too long now till we get the results of their follow up drilling at the Mansounia gold project.
According to their last quarterly activities report:
"In the quarter ended 30 June 2007, Burey completed designing and preparation for a follow up
program. By quarter end, clearing, preparation of access roads, levelling and drill pads had all
been completed. Burey’s follow up programme will comprise RC and oriented DD drilling
(approximately 81 holes for a total of 6,400 metres), sampling and metallurgical test work
over the identified area of oxide mineralization, with surface mapping followed up by RAB or
RC drilling over wider zones in the project area to expand the inventory of known zones of
mineralization. The longer term objective remains the preparation of a bankable feasibility
study for the development of a commercial heap leach operation."
"Drilling commenced after the quarter end, around 20 July and is expected to be completed by
end August, with analysis and interpretation of results thereafter."
According to their last quarterly activities report:
"In the quarter ended 30 June 2007, Burey completed designing and preparation for a follow up
program. By quarter end, clearing, preparation of access roads, levelling and drill pads had all
been completed. Burey’s follow up programme will comprise RC and oriented DD drilling
(approximately 81 holes for a total of 6,400 metres), sampling and metallurgical test work
over the identified area of oxide mineralization, with surface mapping followed up by RAB or
RC drilling over wider zones in the project area to expand the inventory of known zones of
mineralization. The longer term objective remains the preparation of a bankable feasibility
study for the development of a commercial heap leach operation."
"Drilling commenced after the quarter end, around 20 July and is expected to be completed by
end August, with analysis and interpretation of results thereafter."