- Joined
- 18 February 2006
- Posts
- 4,200
- Reactions
- 2
I'm working on an update, but conservatively heres what I see so far,
Top Section Only
2000m Long x 600m Wide x 15m Deep = 18M cubic metres ore,
As we have assumed 1 Cubic Metre Ore Containg Gold = 2T's ore
So 18M x 2 = 36Mt's at avg grade 0.8g/t Au (I think thats safe to say)
36Mt's@ 0.8 g/tAu = 28.8M Grams Gold and since 28grams = 1oz = 1moz's Au
So 1M oz's Au at cash margin of say $150 oz = $150m
Less say $10m start up costs = $140m
@ 70% but I'm pretty sure the can go higher ie free carry the other party = $98m
With current 45m shares on issue = $2 a share
More detail to follow
Top Section Only
2000m Long x 600m Wide x 15m Deep = 18M cubic metres ore,
As we have assumed 1 Cubic Metre Ore Containg Gold = 2T's ore
So 18M x 2 = 36Mt's at avg grade 0.8g/t Au (I think thats safe to say)
36Mt's@ 0.8 g/tAu = 28.8M Grams Gold and since 28grams = 1oz = 1moz's Au
So 1M oz's Au at cash margin of say $150 oz = $150m
Less say $10m start up costs = $140m
@ 70% but I'm pretty sure the can go higher ie free carry the other party = $98m
With current 45m shares on issue = $2 a share
More detail to follow