ta2693 said:The drill result is not impressive at all.
a lot of hole's grade is below 55%. the dust is too much. bad luck.
Rubbish.. I don't think you even looked at it properly. Do you notice the red (being >55% Fe) being dotted along many km on the diagram? This means the *majority* of grades are greater than 55% It's only very widely spaced reconissance drilling at this stage, because of the size of the deposit it's going to take a while before they can narrow it down.
The grades granted are not DSO 60%+ (which are rare), but the majority are 50-60%+ and some of the lower grades can be blended to produce a good mix.
JORC will be as large as many of the other good sized Hematite deposits out there, a simple width x length x depth x specific gravity equation will give you some idea.
The only concern is the lack of deep intersections so far, which will limit it's potential as a very large resource - but it still won't be 20-50mT I can tell you that..