Labor's NBN rollout policy,
https://cdn.australianlabor.com.au/documents/Labors_Positive_NBN_Policy.pdf
The substantive change from current is replacing ~2m FTTN with FTTP (19%) of the total rollout. HFC will remain.
To facilitate the above, Labor intends to renegotiate some of the 3.5m FTTN design contracts that are presently expected to be in place at June 30 2016. 1.3m FTTN construction contracts would however be honoured representing most of the 2016/17 FTTN build.
45%/83% of the final FTTN/B build (2035k/3745k of 4.5m) are projected to be RFS at June 30 2017/2018 respectively according to the current corporate plan. At that rate, this component of the rollout will be easily completed by June 30 2019. Under Labor's policy, this will slow to June 30 2022. Detailed costings are not provided however the delay may explain the peak funding change of $1bn. The above, delayed as it is only as good as it is if peak funding doesn't breach $57b. FTTP is assumed to cost $3,000pp excluding infrastructure leases, a reduction of 17% or $700 from the $3,700 corporate plan cost. That's made up of $450 from the skinny fibre trial and an additional $250 from unspecified cost efficiencies as the rollout progresses. That, if it's achievable, is still $1,400pp more than FTTN.
Capex is expected to be $3.4bn higher than the current plan. With funding constrained by the peak funding cap of $57bn ($1bn more than the current cap of $56bn), the 19% extra FTTP may be left dependent on positive cash flow from operating parts of the network to fund the increased capex. That possibly explains why the rollout profile has been delayed by as much as 3 years and doesn't inspire confidence that it's even financially deliverable.
It looks like a plan B when it became clear that FTTdp trials wouldn't be sufficiently advanced to offer a policy based on that for this election. That may have been deliverable with the $1bn extra on top of the $56bn peak funding for the above 19%.
On the rollout itself, the weekly progress report to June 2 shows 2,587,411 premises RFS, 44,589 short of the June 30 target of 2,632,000. At the present rate of progress, that should be passed with two weeks to spare.
Premises passed and premises activated for various categories are provided in the weekly progress report. To June 2 is as follows,Doc, what is the current take up of the NBN? I have a place in Mandurah, that has a fibre optic cable sitting in space doing nothing.
Labor's NBN rollout policy,
https://cdn.australianlabor.com.au/documents/Labors_Positive_NBN_Policy.pdf
The substantive change from current is replacing ~2m FTTN with FTTP (19%) of the total rollout. HFC will remain.
To facilitate the above, Labor intends to renegotiate some of the 3.5m FTTN design contracts that are presently expected to be in place at June 30 2016. 1.3m FTTN construction contracts would however be honoured representing most of the 2016/17 FTTN build.
45%/83% of the final FTTN/B build (2035k/3745k of 4.5m) are projected to be RFS at June 30 2017/2018 respectively according to the current corporate plan. At that rate, this component of the rollout will be easily completed by June 30 2019. Under Labor's policy, this will slow to June 30 2022.
So Clare is not disputing the idea of FttN being completed by NBN's 2020 deadline -- he is proposing to delay the fixed line rollout by two years in exchange for fibre.
As at June 9, overall rollout/brownfields RFS is 2,618,102/1,550,576 premises respectively, 13,898/29,422 short of respective June 30 targets.On the rollout itself, the weekly progress report to June 2 shows 2,587,411 premises RFS, 44,589 short of the June 30 target of 2,632,000. At the present rate of progress, that should be passed with two weeks to spare.
The reports show Australia's average peak connection speed of 30.1 megabits per second ranked 30th in the world in the quarter ending in September 2013, the month the Coalition took office.
The most recent report available at the time the claim was made shows Australia's average peak connection speed of 39.3 mbps ranked 60th in the world in the quarter ending in December 2015.
44m
Mike Carlton @MikeCarlton01
The hard fact is that, by delivering a 3rd rate NBN, Abbott and Turnbull have blighted the lives of generations to come. Culpable folly.
Mike Carlton @MikeCarlton01
Sackable ?? There should be rioting in the streets. Fact is that Turnbull has right royally stuffed the NBN.
Quentin Dempster @QuentinDempster
Fact Check confirms Australia is disadvantaged by broadband capacity. Is this a sackable offence? (link: http://www.abc.net.au/news/2016-06-21/fact-check-australias-internet-speed-rank/7509352) abc.net.au/news/2016-06-2… via @abcfactcheck
Glenn Lazarus @SenatorLazarus
Mr Turnbull why is Coalition advertising NBN jobs overseas when so many people including tradies are unemployed/desperate for work? #qanda
8457
The founding chief executive of NBN Co, Mike Quigley, has intervened in the last two weeks of the federal election, slamming the Coalition for making a “huge miscalculation” with the network’s use of copper access technologies.]
“Forty-five billion is still the correct peak funding cost if the project (FTTP) had been allowed to continue," he said.
“To believe that the original FttP deployment would have required a peak funding of somewhere between $64bn and $94bn you have to make totally unrealistic assumptions about take-up rates and ARPUs, assumptions that have proven to be wrong.
“You have to distort per premise capex numbers, and finally you have to ignore the improvements in technology that are driving down FttP costs, increasing productivity and reducing FttP build times everywhere else in the world.
“Given the complexity of all of this information it is little wonder that it is very difficult for the average person, or even the media, to sort out fact from fiction concerning the peak funding costs for the original FttP-based NBN.
“But what is clear is that every forecast regarding the NBN that the Coalition has made, for which there is now data, whether for their own MTM or for the original FTTP plan - every one of them has been wrong.”
Another bloke who doesn't have a clue chiming in with his communist manifesto:
I had NBN connected to my house last Monday and I cannot distinguish any difference to ADSL....
Fabians everywhere .
Mal has stuffed the NBN and everyone knows it.
30th to 60th place in internet speeds under the Libs. It's humiliating for the country and the Coalition.
If we want a modern NBN , don't vote Liberal.
That's proof in itself of the failure to launch. Do you know how your connection is configured? e.g. fibre to copper to pit to copper to home to copper or do you have fibre to the premises(home) and what speed did you opt for?
I have FTTP.
I will have to check for the speed and get back to you.
I am happy with the current speed....It is plenty for my use.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?