You don't see the other milestones such as EPA approval, confirmation of finance, construction of port facilities or plant as giving it a kick along the way?
cheers
Surly
http://www.gindalbie.com.au/Our+Projects/default.aspx
The only challenge at present is the sp. looking at multiple moving averages in 3x5 bands (ranging from 7-250 days) I foresee GBG consolidating around $1.10 to $1.30 until production commences. If $1.10 doesn't hold could go back to long term support at .90-.95c
It has broken its resistance of August correction. Seems to be going south irrespectative of good news coming out. It might bounce back and hard from here or will go further down to 50 cent level....
Further analysis on the attached figure much appreciated.
ASX ANN today
SP GBG $0.71 -$0.07 -8.97% high of $0.785 $0.705 2,110,021 shares $1,554,575 @ 31-Jan 16:10:38
http://www.asx.com.au/asx/statistics/showAnnouncementPDF.do?idsID=00807907
31-01-2008 02:23 PM GBG Quarterly Activities Report
DECEMBER 2007 QUARTERLY REPORT
HIGHLIGHTS FOR THE DECEMBER 2007 QUARTER
EXPLORATION
• Premium grade concentrate produced from DTR tests on holes beneath the Blue Hills North and Gully Hematite deposits. Better results include the following:
Blue Hills North
120 metres @ 71.0% Fe and 1.9% SiO2 in concentrate from 96 metres
212 metres @ 71.0% Fe and 2.1% SiO2 in concentrate from 34 metres
Gully
82 metres @ 71.2% Fe and 1.3% SiO2 in concentrate from 98 metres
132 metres @ 70.8% Fe and 1.5% SiO2 in concentrate from 84 metres
• Substantial DSO grade drilling intersections recorded from the Shine Prospect, part of the Warriedar Joint Venture with Royal Resources. Better results include the following:
60 metres @ 62.6% Fe from 59 metres
26 metres @ 63.3% Fe from 55 metres
32 metres @ 62.6% Fe from 92 metres
KARARA IRON ORE PROJECT APPROVALS
• Mungada Hematite Project PER advertised for public review. EPA assessment recommendation and Ministerial decision remains on schedule to be completed by June 2008.
• Karara Magnetite Project PER final draft in preparation.
• The Mid West Strategic Review handed down by the Western Australian Government indicating a predisposition to approve the Karara Magnetite Project.
KARARA IRON ORE PROJECT DEVELOPMENT
• EPCM providers have been short listed and final selection is due in February 2008.
• Concentrator design awarded to Ansteel Mining Design Institute (AMDI) in China.
• 15-year power supply contract signed with Verve Energy.
CORPORATE
• Cash reserves at 31 December 2007 of $51.5m.
• Ansteel’s Mr Wang Heng appointed to the Gindalbie Board.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?