brerwallabi
The Oracle
- Joined
- 5 July 2004
- Posts
- 1,050
- Reactions
- 807
Maiden Dingo Range Gold Project Measured, Indicated and Inferred
Mineral Resource Estimate of 28.0Mt @ 1.13g/t Au for 1,010Koz;
Maiden resource includes the Boundary to Bungarra trend and Freeman’s
Find Prospects which is constrained only by the drilling completed and
remains open at depth and along strike;
Work to date supports Emerald’s view that the Dingo Range Gold Project
has the potential to be the Company’s first standalone mining and
processing operation in Australia;
+90% metallurgical recoveries anticipated from conventional CIL flow
sheet (free milling);
Drilling continues over the prospects in advance of further resource
updates throughout 2025;
Feasibility studies continue in advance of commencement of development
in 2025;
Various data sets for each calculation were finalised between September
and November 2024, subsequent intersections outside of the resource
calculation expected to be included in the next update include;
19.0m @ 2.59g/t Au from 75.0m (RC24NPT132);
2.0m @ 15.09g/t Au from 15.0m (RC24FMF030);
5.7m @ 4.50g/t Au from 99.0m (RCDD22NPT030);
6.0m @ 3.90g/t Au from 96.0m (RC24FMF024);
22.0m @ 1.03g/t Au from 105.0m (RC24NPT126);
1.0m @ 21.00g/t Au from 8.0m (RC24HUR077); and
6.0m @ 2.74g/t Au from 112.0m (RC24HUR083).
Mineral Resource Estimate of 28.0Mt @ 1.13g/t Au for 1,010Koz;
Maiden resource includes the Boundary to Bungarra trend and Freeman’s
Find Prospects which is constrained only by the drilling completed and
remains open at depth and along strike;
Work to date supports Emerald’s view that the Dingo Range Gold Project
has the potential to be the Company’s first standalone mining and
processing operation in Australia;
+90% metallurgical recoveries anticipated from conventional CIL flow
sheet (free milling);
Drilling continues over the prospects in advance of further resource
updates throughout 2025;
Feasibility studies continue in advance of commencement of development
in 2025;
Various data sets for each calculation were finalised between September
and November 2024, subsequent intersections outside of the resource
calculation expected to be included in the next update include;
19.0m @ 2.59g/t Au from 75.0m (RC24NPT132);
2.0m @ 15.09g/t Au from 15.0m (RC24FMF030);
5.7m @ 4.50g/t Au from 99.0m (RCDD22NPT030);
6.0m @ 3.90g/t Au from 96.0m (RC24FMF024);
22.0m @ 1.03g/t Au from 105.0m (RC24NPT126);
1.0m @ 21.00g/t Au from 8.0m (RC24HUR077); and
6.0m @ 2.74g/t Au from 112.0m (RC24HUR083).