Man these guys are busy drilling the **** out of everything.
Announcement out today regarding Washihi Project
http://www.asx.com.au/asxpdf/20120620/pdf/426xxwqgtyk4r9.pdf
Summary
Drilling results confirm the potential for thick mineralisation at high grade from the Washihi Copper-Gold Project in Oman
Result highlights from nine drilling holes totaling 1,615m include:
Ø• 72m @ 1.3% copper, 0.15g/t gold (Hole WH12DD005)
Ø• 18m @ 1.4% copper, 0.21 g/t gold (Hole WH12DD007)
* Drilling results have opened up the potential for thick mineralisation to the north west and south east at depth supporting future Washihi drilling programme
* JORC compliant estimates for the Washihi and Daris East prospects are currently being prepared and Hydrogeological and Environmental Studies are expected to commence in July 2012
* A Scoping Study has also recently commenced for an integrated mining and processing facility supporting the Washihi, Daris and Mullaq prospects
On the 16th May update on Khnaiguiyah Zinc Copper Project
http://www.asx.com.au/asxpdf/20120516/pdf/4268w4fdrhqhpz.pdf
DRILLING HIGHLIGHTS
ZONE 1:
● Hole K1DD12_221 from 24–30.8m: 6.8m at 6.02% Zn; 0.49% Cu
● Hole K1DD12_222 from 63–66m: 3m at 7.51% Zn; 0.95% Cu
● Hole K1DD12_245 from 25.45–34m: 8.55m at 10.91% Zn; 0.19% Cu
including 25.45–28m 2.55m at 21.80% Zn; 0.34% Cu
and 42–47.1m: 5.1m at 10.97% Zn; 0.21% Cu
including 45–46m: 1m at 31.56% Zn; 0.70% Cu
ZONE 2:
● Hole K2DD12_233 from 80.8–86m: 5.2m at 7.15% Zn; 0.14% Cu
● Hole K2DD12_237 from 157–162m: 5m at 8.40% Zn; 0.38% Cu
● Hole K2DD12_239 from 177–188m: 11m at 6.42% Zn; 0.12% Cu
● Hole K2DD12_240 from 91–101m: 10m at 10.90% Zn; 0.31% Cu
ZONE 2 (Copper Rich Zone):
● Hole K2DD12_237 from 164–168m: 4m at 1.09% Cu
● Hole K2DD12_238 from 193.4–203m: 9.6m at 1.47% Cu
ZONE 3:
● Hole K3DD11_037 from 78–82m: 4m at 11.02% Zn; 0.07% Cu
● Hole K3DD11_044 from 187–209.1m: 22.1m at 6.87% Zn; 0.14% Cu
and 214–221m: 7m at 6.69% Zn; 0.65% Cu
● Hole K3DD11_052 from 20–31m: 11m at 5.62% Zn; 0.22% Cu
1st May they provided drilling update for El Quillay Project
http://www.asx.com.au/asxpdf/20120501/pdf/425zj4kpgj6jlt.pdf
Investor presentation here.
http://www.asx.com.au/asxpdf/20120524/pdf/426ftzcfdplmfh.pdf
210.5m shares on issue, 42.6m oppies and should have around $12m in the bank this quarterly.