I clarify my comment:
200 hole drill program over 3.5km² area.
Thats about 2.5km by 1.5km area.
2500m*1500m*3*4m(average thickness) = roughly 45mT of mineralisation.
They've indicated in presentations a small proportion of that is high grade, about 5mT i'd say @ 0.3%
So 40,000,000 @ 0.03 = 12000t in the non high grade areas.
5mT @ 0.3% = 15,000t in the high grade zone. Total about 27,000t to 30,000t in that area(EAST zone). Possible upside with infill drilling as 200 holes is expansive.
AGS get a quarter share.
200 hole drill program over 3.5km² area.
Thats about 2.5km by 1.5km area.
2500m*1500m*3*4m(average thickness) = roughly 45mT of mineralisation.
They've indicated in presentations a small proportion of that is high grade, about 5mT i'd say @ 0.3%
So 40,000,000 @ 0.03 = 12000t in the non high grade areas.
5mT @ 0.3% = 15,000t in the high grade zone. Total about 27,000t to 30,000t in that area(EAST zone). Possible upside with infill drilling as 200 holes is expansive.
AGS get a quarter share.