greggles
I'll be back!
- Joined
- 28 July 2004
- Posts
- 4,475
- Reactions
- 4,537
There is movement at the station...
Volume isn't too far above average but the supply is drying up. A1M is tightly held.
Inaugral drilling program at the Lamil Project commences this quarter. The DeGrussa/Monty style multi-element surface geochemical anomaly at the Curara Well Joint Venture at the Marymia Project is scheduled to be drill tested in the December quarter.
Positions are being quietly taken in A1M IMO. DYOR.
Volume isn't too far above average but the supply is drying up. A1M is tightly held.
Inaugral drilling program at the Lamil Project commences this quarter. The DeGrussa/Monty style multi-element surface geochemical anomaly at the Curara Well Joint Venture at the Marymia Project is scheduled to be drill tested in the December quarter.
Positions are being quietly taken in A1M IMO. DYOR.