- Joined
- 13 June 2007
- Posts
- 1,203
- Reactions
- 2
Start this thread off with truck pictures & photos of some pilbara io roadtrains running the quads out of the mines,ive talked about the looming railway bottleneck as the junior miners like AGO,BRM,UMC look to in the future get their io on the rail.this is presenting a good opportunity for the road transport industry
AGO will be running quads to get their 14mt of dso out of pardoo at the south limb,continous with brumby resources pardoo ground..
so can you all post a truck associated with the IO miner you talk about,this is most prevalent in the midwest with MMX having to run a long way for each 100t to port,be good to hear all the news about the transport of the IO that is going by road...tb
AGO will be running quads to get their 14mt of dso out of pardoo at the south limb,continous with brumby resources pardoo ground..
so can you all post a truck associated with the IO miner you talk about,this is most prevalent in the midwest with MMX having to run a long way for each 100t to port,be good to hear all the news about the transport of the IO that is going by road...tb