- Joined
- 27 June 2010
- Posts
- 4,203
- Reactions
- 329
Li-S Energy is the result of a joint venture between Li-S Energy's founding Shareholders, PPK Group Limited (through its nominee subsidiary, PPK Aust. Pty Ltd (PPK Aust)), BNNT Technology Limited (BNNTTL) and Deakin. Li-S Energy was registered on 12 July 2019 with the objective of utilising BNNTTL and Deakin's existing technology and research to develop a battery technology based on more advanced lithium-sulphur chemistry, where BNNTs and other nanomaterials are incorporated into battery components to:
a. improve battery energy capacity when compared to current lithium-ion batteries; and
b. improve cycle life when compared to conventional lithium-sulphur batteries.
The Company believes that its patent pending BNNT battery construction in its Li-S Energy Batteries addresses the key historical challenges of conventional lithium-sulphur batteries, and testing to date indicates that BNNTs substantially enhance the performance, capacity, stability and cycle life in the Li-S Energy Battery compared to an identical lithium-sulphur battery without BNNTs.
It is anticipated that LIS will list on the ASX during August 2021.
www.lis.energy
a. improve battery energy capacity when compared to current lithium-ion batteries; and
b. improve cycle life when compared to conventional lithium-sulphur batteries.
The Company believes that its patent pending BNNT battery construction in its Li-S Energy Batteries addresses the key historical challenges of conventional lithium-sulphur batteries, and testing to date indicates that BNNTs substantially enhance the performance, capacity, stability and cycle life in the Li-S Energy Battery compared to an identical lithium-sulphur battery without BNNTs.
It is anticipated that LIS will list on the ASX during August 2021.
The world needs better batteries - Li-S Energy
Our revolutionary lithium sulfur batteries are lighter, cleaner and greener and deliver more than twice the energy density of lithium ion.
![www.lis.energy](/proxy.php?image=https%3A%2F%2Fwww.lis.energy%2Fwp-content%2Fuploads%2F2022%2F09%2Fcropped-Li-S-Energy-logo-Col-Symbol-1-32x32.png&hash=63565b42c0c91adc7261a09f5250c48b&return_error=1)