Minigwal (Marengo) is a very promising tenement, 280K North East of Kalgoorlie and was purchased in July 2004. Originally owned by BHP as a promising exploration area for Uranium.
Mount Korong (Marengo) is situated 60K North East of Leonora.
Minigwal (Marengo) is a very promising tenement, 280K North East of Kalgoorlie and was purchased in July 2004. Originally owned by BHP as a promising exploration area for Uranium.
Hmmm time for an update based on YML Qtrly
So does this mean the feasability study will come out in may?
I imagine they would be wanting to get a good positive feasability out in May so that the 25c opies are well in the money when they expire at the end of June.
Having said that, with the SP at 24.5c, I am surprised people are prepared to pay 5c for 25c opies with only 2 months to run. SP has to be at 30c in 2 months just to break even.
Excuse my ignorance, but what does the above link have to do with Yilgarn
Hi, please refer to previous posts on Minigwal.
The following should make everything clearer.
Minigwal and the Minigwal belts: Yilgarn Mining's tenements straddle the Jasper Hill Fault, between the Jasper Hills Dome and Minigwal/minigwal belts in the Irwin Hills - Stella Range.
The smaller tenements, at Rockwell and Matilda, also intrude into the area between and in Merolia, and Minigwal P39/2588 tenement within the E39/352 Yilgarn Mining Area.
These are all part of the Laverton Region Project.
Open pit mining studies have demonstrated that there is potential for a significant increase in
value if inferred mineralisation adjacent to the old stopes in Shoot 1 is included in the
optimisation process. During the period the decision was taken to drill extra reverse
circulation (RC) holes with the objective of upgrading these resources within the Open Pit
design from Inferred to Indicated status. This was considered necessary ahead of a decision
to mine.
The Company has been conducting metallurgical testwork on drill core to establish the
suitability of Carr Boyd ores for treatment at a third party nickel concentrator under a
proposed Ore Off-Take Agreement. The Company anticipates that this testwork will be
completed sometime in May, 2007 following which (but subject to the testwork) the Off-Take
Agreement would be entered into.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?