listing happened, and taking on water

.
Overview:
• Significant advances on its three priority projects.
• All projects have been advanced to drilling phase on completion of recent technical studies.
• Flagship projects continue to yield exciting geochemical, geophysical and geotechnical results, highlighting the world-class potential of all three projects.
Cerro Chacon (Argentina):
• Completion of extensive geophysical and geochemical sampling programmes have identified multiple target areas, reinforcing the potential for significant gold-silver mineralisation.
• The epithermal vein system has been confirmed using signature pathfinder element analysis over a strike length exceeding 10km and remains open to the north and south.
• Extensive initial programme planned at Cerro Chacon with over 5000m of reverse circulation (RC) drilling planned with depths ranging from 140m to 290m.
Sierra Cuadrada (Argentina):
• Auger drilling highlighted extensive areas of near surface uranium mineralisation.
• 1,000 broad spaced shallow auger holes have been completed over an area of 145km2.
• 20% of these holes have defined a 64km2 zone of visible uranium mineralisation.
• Recently gained surface land access to the highest priority project tenements with plans to mobilise an RC rig in the first semester of 2025 to further test extensions and tenure of the mineralisation.
Ashburton (W.A.):
• 2024 drilling programme was completed during December with a further 12 drill holes for an advance of 748m of reverse circulation drilling and 1,306.8m of diamond drilling.
• Significant equivalent U3O8 concentrations from the December Quarterhave been calculated from downhole gamma surveys
• Data from the drilling programme is undergoing geological modelling to determine the 2025 field programme.