12-06-2007 10:01 AM GDN Progress Report
http://www.asx.com.au/asx/statistics/showAnnouncementPDF.do?idsID=00728786
PROGRESS REPORT• The completion rig for Paradox Basin #1 oil & gas well, Grand County, Utah, is due on location on Friday 15 June
• Site works at the Daneros Uranium Prospect, White Canyon Uranium District,
Utah, will commence this week. The rig for the initial drilling programme is mobilising on Monday 18 June
PARADOX BASIN #1 OIL & GAS WELL, GRAND COUNTY, UTAH
Well Stimulation Programme
The well completion rig is due on location on Friday 15 June to commence a stimulation and fracturing programme on the major Pennsylvanian Barker Creek gas interval and on the shallower gas zones indicated above the Barker Creek interval, in the Upper Barker Creek, Akah and Upper Ismay intervals.
As a first priority, perforation, testing and stimulation will be undertaken on the following Pennsylvanian section gas shows:
Formation....
Gas zone (feet) Gas zone (m) Oil & Gas Indication
Upper Ismay 9,845’ - 9,858’ 3,001 - 3,005
Gas in dolomite reservoir rocks at up to 520 units, with connection gas levels up to 3,000 units.
Akah 10,815 - 10,834’ 3,296 - 3,302
A gas show of up to 790 units.
Upper Barker Creek 11,015’ - 11,031’ 3,357 – 3,362
A 16’ gas-bearing interval (390 units), in a sandstone unit marking the top of the Barker Creek member.
* Barker Creek 12,561’ - 12,599’ 3,828 - 3,840
A major pressured gas interval in dolomitic sandstone. Gas (methane, ethane and trace propane) was present at levels of up to 2,300 units, with connection gas up to 3,300 units.
* In May, following perforation and initial fracturing using carbon dioxide of the above Barker Creek interval, gas flowed to the surface and was flared with progressively increasing levels of gas before shutting in. 37 tons of was injected into the formation to clean up the productive interval without effecting any of the reservoir characteristics. The zone will be further fractured and tested using the completion rig.
The Pennsylvanian-age Barker Creek was one of the primary targets for Paradox Basin #1.
The well location was chosen as an optimal place to test this deep target due to good seismic control at this point and coincidence with a large flexure throughout the Pennsylvanian section. The oil and gas shows encountered at this level are very encouraging and indicate a further potential accumulation east and up-dip from the well.
This provides a priority target to be tested in the second well location, Paradox Basin #2, currently being permitted.
A review of the well results in the Pennsylvanian section above the Barker Creek interval, conducted by an independent consultant, announced on 12 October 2006, concluded:
“This remains one of the most significant wells to be drilled in this region if not in the US this year.”
WHITE CANYON URANIUM PROJECT, SAN JUAN COUNTY, UTAH
Uranium drilling
Site access works to commence on Friday 15 June. The initial drilling programme will begin on the Daneros uranium-vanadium ore body at White Canyon on Monday 19 June, initially with 10 holes to confirm width and grade of earlier drill holes used to generate the historical reserve (see announcement of 3 May 2007).
Complete results of this initial drilling programme will be available within three weeks of completion.
White Canyon Uranium Project is subject to a Memorandum of Agreement (MOA) between Golden State and White Canyon Exploration LLC, a Utah-based uranium explorer and miner.
Details of this agreement are contained in the 3 May announcement.
Prospectus for Uranium IPO
Snowden Mining Industry Consultants has been appointed Independent Expert for the IPO capital raising for the spin off of the uranium assets of Golden State and White Canyon under the MOA. Snowden field investigations have been completed.