ASX ANN just issued
GDN 6:00 PM Third Quarter Cashflow Report
http://www.asx.com.au/asxpdf/20070430/pdf/3126w094z24kqj.pdf
-- Cash at end of quarter $1,962,000
GDN 6:00 PM Third Quarter Activities Report
http://www.asx.com.au/asxpdf/20070430/pdf/3126vyx9xyrpmm.pdf
HIGHLIGHTS
• Golden Eagle Oil & Gas Prospect, USA: The Paradox Basin #1 lost pipe recovery was completed on 27 March. The well is at 16,306 feet (4,970m). Gas shows were encountered in the Leadville Limestone objective. Drill stem test is underway.
•
Thompson Uranium Project: The uranium assets of Golden State Resources and Utah miner White Canyon Exploration are to be spun off in a new ASX-listed uranium mining and exploration entity, to deliver the Company’s shareholders maximum value and exposure to the uranium market. Golden State shareholders will have a priority entitlement in the capital raising for the new company.
• Laverton Gold Project: New gold anomalous alteration zone located by RAB drilling
• Johnston Range Iron Ore Project: Bedrock iron ore targets to be tested in coming quarter.
GOLDEN EAGLE PROSPECT - ONSHORE OIL & GAS, UTAH, USA
During the quarter, drilling continued on the Company’s first well, Paradox Basin #1, on the Golden
Eagle Oil & Gas Prospect in Grand County, Utah. An extended period of lost pipe recovery was completed on 27 March.
Drilling continued into the Pennsylvanian Molas Formation and Mississippian Leadville Limestone Formation. A gas show was intersected from 15,822’ to 15,883’ at 200 units of C1 (methane) and C2 (ethane). Background gas levels increased to 300 units with connection gas up to 600 units.
The well passed from the Leadville Limestone into the Devonian Ouray Formation at 15,916’, then entered the objective McCracken Sandstone at 16,200’. The well is currently at 16,306 feet (4,970 m), in the objective McCracken Sandstone. Background gas levels are reduced although with trip gas up to 940 units.
The rig is currently conducting a drill stem test (DST) to test gas levels and pressures in the Mississippian Leadville Limestone target. Gas shows from the Leadville Limestone would likely be subdued by the hydrostatic pressures associated with increased depth of drilling operations. Following completion of the DST the well will drill on into the McCracken Sandstone objective.
PRODUCTION AND PERMITTING
So far twelve potential gas production intervals have been defined in Paradox Basin #1 between the Upper Ismay and the Leadville Limestone, as well as one potential oil interval. Permit applications for a connector production pipeline to the nearby Williams Northwest Pipeline have been lodged.
Permitting for an onsite gas plant awaits completion of the well. The production potential for the intervals annotated below will be determined upon setting production casing and conducting flow tests at the completion of drilling.
THOMPSON URANIUM PROJECT, UTAH, USA
Golden State Resources has executed a memorandum of agreement for a mining and exploration joint venture between the Company and Utah-based independent uranium miner White Canyon Exploration LLC to combine their respective uranium-vanadium resource and exploration assets into a specialized uranium mining entity to be listed on the Australian Stock Exchange.
It is anticipated that Golden State and White Canyon will each hold approximately 30% of the new entity, with the remainder to be held by the public as a result of a planned capital raising. It is the intention of Golden State’s directors that there will be a priority entitlement for Golden State shareholders to participate in this raising.
The agreement is the result of six months’ negotiation with White Canyon and will provide the Company’s shareholders with the greatest value for the Thompson Uranium Project and exposure to a much larger advanced project with a short time frame towards mining operations.