General working capital $707,885 ?
That iss more than the 3 proposed drilling explorations combined. They really need to break that down into more specifics.
I don't hold, but i hate it when the majority of funds obtained goes to elements non operation based.
Brumy to commence drilling Bootu Creek North .. They had better push to get these results out pre 31 Jan 10 if they want to try and get the options over the line .. Options Very Cheap Now but huge risk on the results not being out or being rubbish...
Brumby Resources Limited (Brumby) (ASX: BMY) is pleased to announce that a programme of Reverse Circulation (RC) drilling commenced on 6 December 2009 at its Bootu Creek North manganese project in the Northern Territory.
This first pass drilling programme of approximately 2,500 metres is designed to test seven EM (electromagnetic) anomalies previously defined by Brumby in a helicopter supported geophysical survey.
The anomalies occur about 10 kilometres along strike from OM Holdings Bootu Creek open cut manganese mine. Brumby considers that these anomalies are situated within the same geological and structural setting to those hosting the OM Holdings manganese deposits. Brumby’s Bootu Creek North manganese project is located within the Bootu Creek manganese province, located approximately 125 kilometres north of Tennant Creek in
Australia’s Northern Territory. These EM targets are located within the western section of Brumby’s wholly-owned EL25354. This tenement covers an area of 78 square kilometres and is located mid-way between OM
Holdings’ Bootu Creek manganese mine to the south and the Helen Springs project area to the North – also held by OMH (refer to Fig 1).
Subject to weather conditions, it is anticipated that the drilling programme will take approximately two weeks to complete and assay results should be available in late January 2010.
Every hole that is drilled is a new hole and a new result same goes for all explorers. I still have faith and await results. Hoping the rain holds off till they get the drilling done.Wonder what they'll come up with this time.
More buried trucks or bore water?
Personally i think they're running out of time & they've run their race.
Every hole that is drilled is a new hole and a new result same goes for all explorers. I still have faith and await results. Hoping the rain holds off till they get the drilling done.
This tenement, although rather small compared to those around it, is sitting in a prime position between Sinosteel's tenement, OMH's open cut mine(right next door) and OMH's Helen Springs project. If they do hit some substantial grades hold on to your hats, toot toot and all that.
OMH have some pending drill results from Bootu Creek this month too, not sure of proximity to BMY's proposed site though.
Number of securities available under the Entitlement Issue: 31,657,703 sharesI would think they would have drilled their best prospects by now and without any results it does'nt give me any confidence in the team.
How did they go in their last capital raising? That would sum it up.
I am surprised that the company hasnt been taken over by tiger boi as yet at these prices..
If the results are there the share price will run.. if they are not.. then the directors will need to find a new job cause the wont be able to flog this horse for any more salaries and cap raisings..
I am surprised that the company hasnt been taken over by tiger boi as yet at these prices..
Anyway sitting on my options.. not point dumping them.. fingers crossed that if there is a result its before end of January ..not the day after..
Still needs to move a fair bit to get these options cracking.. but hec its the biggest volume since ever so it may get on some radars ... are there results for any more holes due ? ? I would expect they may drop another bomb week or so before option expiry... I will jump on the BMY ship now too to help push it up .. (and for the profits)..
In answer to my question .. YES MORE DRILL RESULTS DUE OVER NEXT 10 DAYS WOULD BE EXPECT ..
Brumbys Bootu Creek North manganese project is located within the Bootu Creek manganese province, located approximately 125 kilometres north of Tennant Creek in Australias Northern Territory.
These EM targets are located within the western section of Brumbys wholly-owned EL25354. This tenement covers an area of 78 square kilometres and is located mid-way between OM Holdings Bootu Creek manganese mine to the south and the Helen Springs project area to the North also held by OMH (refer to Fig 1). Subject to weather conditions, it is anticipated that the drilling programme will take approximately two weeks to complete and assay results should be available in late January 2010."
Optimism paid off. Bootu Creek is now the key for the sp to really motor or stall on the back of this Goldsworthy project. At least they now have a good project which can be revisited for futher drilling and is in close proximity to existing infrastructure and more importantly 13k's from AGO's project.In answer to my question .. YES MORE DRILL RESULTS DUE OVER NEXT 10 DAYS WOULD BE EXPECT ..
Brumbys Bootu Creek North manganese project is located within the Bootu Creek manganese province, located approximately 125 kilometres north of Tennant Creek in Australias Northern Territory.
These EM targets are located within the western section of Brumbys wholly-owned EL25354. This tenement covers an area of 78 square kilometres and is located mid-way between OM Holdings Bootu Creek manganese mine to the south and the Helen Springs project area to the North also held by OMH (refer to Fig 1). Subject to weather conditions, it is anticipated that the drilling programme will take approximately two weeks to complete and assay results should be available in late January 2010."
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?