currently in a trading halt, pending the release of results from the recent 26 hole, 2,500m RC drilling program at the Lignum Dam Gold Project
recent RAB drilling results incl 4m @ 3.13 g/t from 16m; 4m @ 3.63 g/t from 44m; 8m at 4.19 g/t from 60m; 8m at 2.43 g/t from 44m; 5m @ 2.14g/t from 41m; 3m @ 2.82 g/t from 37m; 12m @ 6.65 g/t from 48m
the recent RC drilling was testing depths below those of the RAB drilling program
recent placement raised $1.15M, for total cash of $2.47M
approx 220M shares
11.85M options
sp .034
MC $7.9M
also has 75% interest in manganese (Mt Chester)
55% nickel (Golden Ridge); 40% to 20% nickel Acra jv (with xstrata)
cheers
another quality post brought to you by happytown inc
recent RAB drilling results incl 4m @ 3.13 g/t from 16m; 4m @ 3.63 g/t from 44m; 8m at 4.19 g/t from 60m; 8m at 2.43 g/t from 44m; 5m @ 2.14g/t from 41m; 3m @ 2.82 g/t from 37m; 12m @ 6.65 g/t from 48m
the recent RC drilling was testing depths below those of the RAB drilling program
recent placement raised $1.15M, for total cash of $2.47M
approx 220M shares
11.85M options
sp .034
MC $7.9M
also has 75% interest in manganese (Mt Chester)
55% nickel (Golden Ridge); 40% to 20% nickel Acra jv (with xstrata)
cheers
another quality post brought to you by happytown inc