- Joined
- 10 March 2008
- Posts
- 313
- Reactions
- 0
Hey Datsun,
looking at all the ASX announcements on this well they have all been optimistic rather than positive notwithstanding there have been both gas and oil shows once they reached the target zones. I'm becoming a bit guarded about EGO there's gas there but maybe not commercial otherwise why is the SP still limping along? Then on the other hand why did EGO increase your stake in the permit during drilling if the results are less than they expected?
It's one thing to make ASX announcements as required but maybe it's time to make then in plain English so that investors are properly informed. I for one really don't know the real status of this well. At least I don't have to wait long to find out. Monday is going to be make or break day. I'm hoping for the former as I've been a long term holder.
Now on the sidelines but still interested in the outcome. You'll have to watch the announcements very carefully, if they intersect the D sands and the tone of the announcement is not clearly positive then I'd be getting out quick. Also look for a significant drop on unexplained news, that will be all the aunties, uncles, siblings cousins, neighbours and friends of the EGO directorship armed with 'special' infomration all getting out......
Hey Datsun,
this is what EGO said today
Update 0600 hrs 14-12-09
drilled into Top D sands very strong oil shows between 3568m - 3573m. These very strong oil shows will be evaluated further on electric wireline logs
In line with your comment above I would say that "very strong" is clearly positive. The SP is up 0.002 today on volumes of over 152m. I'm feeling happier today.
What do you think?
Sold out my remaining EGO today, held at .013c again today, the "Very strong Oil shows" were only over 5 metres and no volumes, the gas they were expecting is either lower in the D sands or not there at all.
Ego Report today not looking to good no real mention on oil pooling & gas unit decreasing, which I would have thought should be increasing as they drill into the D sands, cant' help but feel another duster on the way. I think the company is trying to stretch this drill out I can't belive how long it has taken to get to this stage.
Hi any of you guys still on the Ego Express
Think you are a bit harsh boys, you dont pull the string out in a couple of minutes,
They drilled 75 odd metres from Tues Wed.
Maybe they are running the logs so often because they have a good result.
In the last ann....
"Correlation of intervals in the ‘D’ Sand place Gingin West-1 high to Bootine-1."
"Drill ahead to equivalent D Sand Gas interval that flowed 2.25 MMCFGD in Bootine-1 prognosed Top at 3750m-3755m."
So far the drill has virtually mirrored Bootine 1..and guys 2.25mmcf/d is COMMERCIAL!!
"Completion equipment being trucked to location."
Did you note that 1 line fellas??
P and A equipment would be on site from spud IMO.
"Completion equipment" may be to ready the the well for production.
I bought in at 2.2c about 3 years ago.............i HOPE so.:
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?