Normal
Hi Agentyeh knew that, but ta.'In ref tou frac mentioned, not sure which one you where refering to so, but i think you meant easely:From update:Easely - No specific mention of frac, "The well is scheduled to take approximately 40 days to drill, which includes a vertical pilot hole from which additional data on the Eagle Ford Shale will be gathered. The well has been designed with a 4,000 ft horizontal section and will access both the Austin Chalk horizon, which is locally prevalent within the Sugarkane Field and the Eagle Ford Shale when it is subsequently stimulated.."
Hi Agent
yeh knew that, but ta.'
In ref tou frac mentioned, not sure which one you where refering to so, but i think you meant easely:
From update:
Easely - No specific mention of frac, "The well is scheduled to take approximately 40 days to drill, which includes a vertical pilot hole from which additional data on the Eagle Ford Shale will be gathered. The well has been designed with a 4,000 ft horizontal section and will access both the Austin Chalk horizon, which is locally prevalent within the Sugarkane Field and the Eagle Ford Shale when it is subsequently stimulated.."
Hello and welcome to Aussie Stock Forums!
To gain full access you must register. Registration is free and takes only a few seconds to complete.
Already a member? Log in here.