In WA, the net feed-in tariff scheme is reviewed every three years or when 10 megawatts of new generation is installed. This, I assume is for new installs.
From the graphic in post #73 above, about 18000 systems were installed under the scheme from August 2010 to March 2011 with the monthly install rate rising rapidly. This takes new generation capacity well above 10mW even assuming an average size of 1.5kW.
Expect a downward adjustment in the 40c/kWh feed-in tariff in the upcoming WA state budget.